Saturday, April 19, 2008

More Interior Detail Progress

The interior painting is done on the walls and ceilings. The color isn't accurately depicted here because the skylights and windows are still covered, but the color is beautiful. The paint color is called Crisp Khaki. The ceilings are done in a 25% formula of the same color. The baseboards are next!! This picture shows looking down the hallway with the great room to the left.

Travertine floors


The travertine floors are done in the kitchen, laundry room, pantry, hallways and powder room. The first picture shows part of the kitchen and the second is in the kitchenette area of the casita looking out towards the great room.