Sunday, January 13, 2008

Interior Detail Progress



The interior has most of the drywall completed with the light holy smooth texture. These pictures show some of the details with the arches and ceiling in the front entryway, hallway and great room

Progress on the exterior



The top picture is the first coat of the stucco. The color, a pretty olive brown should go on next week. The next picture shows the tiles on the roof ready to be placed and also shows 2 of the 6 skylights.